While the upper level slabs "cook", works have shifted to the lower level. Jack and his excavator have returned to finish the lower level rock walls, slab undercut and site drainage.
Jack carefully positions a large rock in the retaining wall
Clay shoots a level for the underslab cut with the laser.
No comments:
Post a Comment