Friday 17 May 2013

Finished the granite floor

Despite being heavy work, bricklayer Bernie completed the granite floors covering over 200m2 of floor. Bernie's attention to detail shows in the layout of the stone.

Granite set in place and grouted


Monday 13 May 2013

Electrical fittings

Electrical contractor Richard has fitted the Hi Bay lights to the lounge area


One of 3 HiBays over the lounge area

Thursday 2 May 2013

Verandas and shade structures

Shelter from the storm, shade in the hot summer sun and set up to allow winter sun to penetrate deep into the building, the verandas and shade structures perform and important role

Blackbutt cladding and shade structures


Veranda awaiting roof sheets