With the pump set up, the concrete was poured into the middle level slab first, then the upper level. We put a total of 50m3 of concrete into the slabs, and all was in place by 12.30.
The concreters worked behind the pour, screeding to a rough level, then to a finished level. Ollie troweled off the surfaces with the helicopter and Robyn finished off in the tight corners etc.
The concrete pump beats pushing barrows of concrete around.
Robyn trowels the edge
Ollie with the "helicopter" troweling machine.