Friday, 15 June 2012

Up go the roof frames

Hired a crane for the day, had the bolt holes all pre-drilled and from dawn to dusk got the whole frame
tied together before sunset. 
The Barwon Heads bridge timber settling into it's new role.
The final piece slips in on dusk.

No comments:

Post a Comment