Friday 9 December 2011

Time for reflection

After a solid effort, both slabs are complete, storm-water system is in place, wastes are mostly completed and the heavy lifting of the landscaping is complete. As we prepare for the framing stage   we can be thankful that most of the in-ground work is complete and the summer is ahead of us.
After wetting down the concrete, the early morning sun is reflected on slab2.