Sunday, 21 July 2013

Highlights and Blackbutt

The Blackbutt timber window frames highlight the northern sunshine and ventilation, once the black plastic is removed and louvres are fitted.


New highlights



Monday, 15 July 2013

Lustre de sabot de cheval

Thanks to some dedicated welding from Mick and Kevin, these worn horseshoes have found the light at the end of the road. Well nearly, just got to finish the connection.

Tuesday, 25 June 2013

En suites

The ensuites are ready to go with plumbing fixtures in place, tiling and lights as well as glass screens and tap ware.





Hand basin, granite floors and tiles


Glass shower screens, shower fittings

Tuesday, 11 June 2013

Interiors, doors and plaster.

The carpenters have hung the interior doors, and fitted locks etc, plastering is completed.


Doors in place



 last light down the breezeway


Plaster work in office


Fire wall in mudroom

Kitchen basics

In keeping with our recycle, reuse, ethos, we were able to source an excellent commercial stove, fitted for LPG on Ebay. Installed and ready to be commissioned, the stove should be a source of many a long table meal.

The Waldorf Range stands by ready to to start cooking with gas.


Commercial sink in place

Monday, 3 June 2013

Painters final touches outside

The painters enjoyed a brief stretch of fine weather to complete the exterior painting.

All painted and polished.

Friday, 17 May 2013

Finished the granite floor

Despite being heavy work, bricklayer Bernie completed the granite floors covering over 200m2 of floor. Bernie's attention to detail shows in the layout of the stone.

Granite set in place and grouted